The page is built as a visual specification, not a checkout page.
Each product can be adjusted to project dimensions, material direction, production requirements, and delivery country. Use the images as a design reference, then request a quotation for the actual scope.
Materials
The finish direction can be coordinated with the full room.
Material selection changes the feel, durability, price, and production timeline of each furniture item. We recommend final choices after reviewing the room mood and adjacent furniture.
Solid wood internal frame
High-density layered foam
Premium fabric or leather upholstery
Optional marble, wood, or metal coffee table pairing
Custom Options
Module size, upholstery, cushion firmness, chaise, ottoman, and color
Final sizing is confirmed after floor plan, room dimensions, and placement requirements are reviewed.
Production Time
Production time: 35-45 days
Typical production lead time depends on material, quantity, and customization complexity.
Suitable Space
Recommended rooms
Living rooms, villa lounges, hotel suites, private clubs, and open-plan apartment lounges.
Customization
Made-to-order details turn the reference into a project-ready product.
A high-end furniture order should not be forced into fixed retail specifications. We can adapt key details so the product belongs to the room.
Module length and corner composition
Fabric, leather, color, and cushion firmness
Chaise, ottoman, and side-table modules
Coordinated rug, TV unit, and lounge chair suggestions
Specification summary
Key details for quotation.
Solid wood frame, high-density foam, premium fabric or leather
Module size, upholstery, cushion firmness, chaise, ottoman, and color
Production time: 35-45 days
Suitable for Living room, villa lounge, hotel suite
Next step
Send your room details for an accurate quote.
Furniture pricing depends on size, finish, quantity, logistics, and project schedule. Submit your floor plan or room dimensions so the quotation can match your actual project.